Client: |
Pilbara Minerals Ltd |
Location: |
Wojina, Western Australia |
Capacity: |
2 Mtpa |
Scope: |
Concentrator & Associated Infrastructure |
Detailed engineering design and specification of a lithium tantalite concentrator to produce both coarse and fine specification products. The design followed a competitive ECI process. DRA Global were awarded the design and construction of the concentrator on an EPC basis.
Completion of the Engineering Design (all disciplines) for the processing facility included: