Maruwai CHPP (EP)

Client: PT ADARO
Location: Central Kalimantan, Indonesia
Value: US$50 million
Period: Current
Scope: Design, Procurement, Delivery of equipment and materials, Construction surveillance and Commissioning

DRA Global was awarded a $50M contract by PT MARUWAI COAL (PTMC), for the design, procurement, delivery of equipment and materials, construction surveillance and commissioning of a new coking coal handling and preparation plant (CHPP). The CHPP is located at Lampunut, Central Kalimantan, Indonesia.

The project is being delivered as an E&P, including all engineering disciplines, logistics and delivery in Indonesia. DRA’s involvement in the next phase of the project will be the construction surveillance and commissioning.

The project scope includes a 600t/h ROM Sizing Circuit; including ROM Bin, 3 stage crushing, CPP Feed Surge Bin. The coal is processed by a single 550t/h CPP module including; Flotation and Product Filtration. The reject is discharged into a Reject Bin for truck loading and the product is stockpiled by a Radial Stacker.