Following the successful completion of a feasibility study and capital budget estimate, DRA Global was contracted to undertake the multi-level mine design of the Leeuwkop Shaft Project for Impala Platinum.
Due to in-depth knowledge of the resource geology the best method of accessing the ore body to maintain optimal, sustainable production output was selected. The project will make a significant contribution to the future economic viability of the group operations of Implats and Afplats.