Client: |
Atalaya Mining |
Location: |
Mt Gibson Ranges, Western Australia |
Capacity: |
10 Mtpa |
Scope: |
Optimisation Study |
DRA's scope includes the review and optimisation of the flowsheet and plant layout, major equipment sizing and capital and operating cost development to a 15% Class 3 accuracy.
The Process Plant consists of the following unit operations: