



Client: |
Kalium Lakes Limited |
Location: |
Pilbara Region, Western Australia |
Capacity: |
90,000 tpa |
Scope: |
Engineering, Procurement & Construction |
The Beyondie Sulphate of Potash Project (BSOPP) is a greenfield development, comprised of a high-grade brine deposit that will supply an evaporation and processing operation.
Infrastructure at BSOPP includes high-density polyethylene lined pre-concentration ponds, production and recycle ponds, a gas fired power station and gas supply infrastructure.
The DRA project scope entails the engineering, procurement, and construction of a 90,000 tpa Sulphate of Potash facility. DRA is responsible for: