Client: | ABInbev |
Location: | South Africa |
Value: | ZAR R1.3 billion |
Scope: | Engineering, Procurement and Contruction Management |
Period: | April 2017 - March 2018 |
Situated in the North West of Pretoria, the expansion of the Rosslyn plant commenced in April 2017 and the main body of work was concluded in March 2018. The project will cost an estimated R1.3 billion.
DRA provided SAB with a fully-fledged team of experts which formed an integrated ‘Owners Team’, which enabled DRA, in conjunction with SAB’s project team members, to effectively manage the project, allowing the project team to make quick decisions to overcome obstacles.
DRA’s involvement includes project management, design integration, construction and safety management services for the following: