Since 2019, DRA has been the EPCM contractor at the Modikwa Platinum Mine (MPM) in South Africa – a joint venture between Anglo American and Africa Rainbow Minerals (ARM).
DRA has a long-standing relationship with the customers as the Company completed an engineering, procurement and construction project on Modikwa in 2010. Almost a decade later, DRA was brought back for the construction of a 240ktpm Chrome Recovery Plant. This project ties into the existing Modikwa UG2 Concentrator plant and includes:
DRA have completed the engineering, procurement and fabrication phases with final commissioning forecast to be completed towards the end of 2021.