Client: |
BHP Billiton Mitsubishi Alliance (BMA) |
Location: |
Daunia Mine, Queensland |
Period: |
November 2012 – November 2013 |
Scope: |
Structural, Mechanical, Piping and Electrical Instrumentation (SMP&EI) Installation |
G&S Engineering, A DRA Global Company, was engaged to undertake the Structural, Mechanical, Piping and Electrical Instrumentation (SMP&EI) installation of the Coal Handling and Preparation Plant (CHPP) including:
G&S supplied all construction equipment, cranage, supervision and labour required for the project including commissioning support labour spanning pre-commissioning through to wet commissioning and handover. The plant was delivered on time, without any injuries, and with a peak workforce of over 170 people.